Building and Civil Engineering Contractors

Victoria College, Belfast

CLIENT
Victoria College

DURATION
17 months – phased working

VALUE RANGE
£3m – £5m

LOCATION
Cranmore Park, Belfast

DESIGN TEAM
Architect: Povall Worthington
Structural Engineer: Brian W Murray Ltd
M&E Engineer: Integrated Services Design
Quantity Surveyor: Hawthorne Consulting

Completed within a 13-month timeframe, phase 1 of this project comprised four key elements:

- construction of a newbuild two-storey sports building (GIFA 1,750m2), including a 4-court sports hall and associated sports equipment. Other accommodation in the sports building includes 4nr pupil changing rooms including showers; 2nr staff changing rooms including showers; pupil WCs including disabled WCs; P.E. office; hygiene room; storerooms; electrical switch room; plant room and cleaner’s store. A fitness suite, P.E. classroom and glazed viewing gallery are located on the first floor.

- 7 a-side synthetic hockey pitch to replace the existing all-weather pitch; including line markings; floodlighting; perimeter sports fencing; goals and team dugouts

- resurfacing the existing 4nr tennis courts; new perimeter sports fencing

- major site development works including site clearance and demolition of a sports pavilion; major reduced level excavation; construction of retaining walls up to 3m above ground level; soft landscaping and construction of an access road and path

Phase 2 of this project comprised internal reconfiguration and refurbishment works within the existing school to provide additional science, technology and art classroom accommodation. These works were accelerated during school holiday shutdowns to minimise the impact on normal school activities.